Prince Manufacturing is excited to announce our new state of the art painting system.

We are offering two new options.

Locate a Distributor
Orion Registrar Inc.

ISO 9001:2015

Prince Manufacturing Corporation's Quality Management System is certified to ISO 9001:2015 by Orion Registrar, Inc, as are each of our manufacturing facilities.

MEMBERSHIPS

FEMA

AEM

NFPA

Best-In-Class-Employer

CONTACT US

  (605) 235-1220

  prince@princehyd.com

More >>
THE PRINCE APP


load it on your Apple or Android Device ad use to easily perform hydraulic calculations and configure pumps, valves and cylinders.

Protection for up to 800 hours against corrosion

  • The process starts by going through a 5 stage wash system that includes the environment friendly Bonderite NT-1
  • After the wash it gets a base primer coat
  • From there it gets a top coat of PPG polyester polyethylene
  • Our controlled application system assures the proper amount of paint is applied to provide superior coating performance

Protection for up to 1000 hours against corrosion

  • Our most robust coating
  • This will become available in the late summer to early fall of 2014
  • Our controlled application system assures the proper amount of paint is applied to provide superior coating performance
  • Gives your product up to 1000 hours of protection in the B117 salt spray test
  • Also goes through our 5 stage wash system but after getting washed the product will get immersed in a proprietary A-Coat bath
  • After drying the product will get a top coat of our PPG polyester